Pharmaceutical Water Systems
Agenda: Day Two
V. Establish and Confirm the Standard Operating Procedure (SOP)
- Outline roles and responsibilities of validation team members
- Identify documents needed for qualification
- Recognize the key components of commissioning documents
- Sampling points
- Frequency
- Sampling techniques
- Acceptable sample sizes
- Develop Standard Maintenance Procedures (SMPs)
- Identify the key components of Installation, Operation and Performance
Qualifications (IQ/OQ/PQ) - Establish acceptance criteria
- Collect enough data to verify the SOP and evaluate the water system
Exercise: Identify Required Qualification Documents
VI. Document Compliance with Validation Requirements
- Provide an accurate description and print of the water system
- Perform IQ, OQ, PQ
- Perform and document change control
- Write a thorough validation document and obtain approval
Exercise: Build and Document your Water System
VII. Troubleshoot Efficiently and Effectively
- Identify commonly overlooked sources of contamination
- Plan a course of action for when action limits are exceeded
- Outline steps to take when specifications are exceeded
Exercise: Variance and Deviation Investigations
VIII. Comply with 21 CFR Part 11
- Interpret regulatory requirements for e-records and e-signatures and their applicability to
water systems - Qualify software used to monitor water systems
- Examine strategies for compliance
IX. Examine Additional FDA Expectations
- Address additional requirements, including:
- Maintenance logs
- Qualification and certification of equipment/vendors
- Reviews and investigations
- Assess the consequences of non-compliance
Exercise: Review Recent 483s and Warning Letters
Booking Options
This course is available exclusively as an onsite training solution. To discuss a solution that fits your organization's needs, objectives, schedule and budget, contact a PTi Client Solutions Manager at 800-303-8194 or OnSiteSolutions@pti-international.com.